AIMS
North process trainOverview
Integrity cockpit · 06 Sep 2026
Good morning, your risk picture is ready.
One high-priority vessel requires review while the connected piping system remains within its approved inspection window.
Live snapshot
2
Tracked components
Across 1 active process system
Live snapshot
1
High / critical risk
Requires engineering review
Live snapshot
2
Inspection points overdue
Prioritise the next campaign
Live snapshot
100%
Risk coverage
All seeded components screened
Live system view
North process train
Hydrocarbon separation · Area 04 · Separation
Inspection due
Parametric vessel
Drag to orbit · scroll to zoom · click a point to inspect Low Med High Critical
V-101High pressure separator
Risk distribution
Screening matrix
Low0 components
Medium1 component
High1 component
Critical0 components
Risk score is a screening aid based on probability × consequence. Review decisions through your approved integrity process.
Next actions
Inspection points needing attention
Inspection pointMethodStatus