AIMS

Integrity cockpit · 06 Sep 2026

Good morning, your risk picture is ready.

One high-priority vessel requires review while the connected piping system remains within its approved inspection window.

Live snapshot

2

Tracked components

Across 1 active process system

Live snapshot

1

High / critical risk

Requires engineering review

Live snapshot

2

Inspection points overdue

Prioritise the next campaign

Live snapshot

100%

Risk coverage

All seeded components screened

Live system view

North process train

Hydrocarbon separation · Area 04 · Separation

Inspection due
Parametric vessel
Drag to orbit · scroll to zoom · click a point to inspect
V-101High pressure separator

Risk distribution

Screening matrix

Low0 components
Medium1 component
High1 component
Critical0 components

Risk score is a screening aid based on probability × consequence. Review decisions through your approved integrity process.

Next actions

Inspection points needing attention

Inspection pointMethodStatus