Integrity desktop · KPI overview
North process train
26 tracked components · 5 process areas · browser-local project
Portfolio health65%Assets below high risk
Inspection coverage90%30 mapped points
Review queue9High / critical components
Risk distributionScreened component mix
LIVEInspection workloadCurrent campaign readiness
30 PTSOverdue3
On track27
AIMS
North process trainRBI assessments
Integrity cockpit · 06 Sep 2026
Good morning, your risk picture is ready.
26 components across 5 process areas. Includes 24 illustrative demo components; example risk scores are not verified field assessments.
Live snapshot
26
Tracked components
Across 5 process systems
Live snapshot
9
High / critical risk
Requires engineering review
Live snapshot
3
Inspection points overdue
Prioritise the next campaign
Live snapshot
100%
Risk coverage
All seeded components screened
Live system view
North process train
Hydrocarbon separation · Area 04 · Separation
Inspection due
Parametric vessel
Drag to orbit · scroll to zoom · click a point to inspect Low Med High Critical
V-101High pressure separator
Risk distribution
Screening matrix
Low8 components
Medium9 components
High9 components
Critical0 components
Risk score is a screening aid based on probability × consequence. Review decisions through your approved integrity process.
Next actions
Inspection points needing attention
Inspection pointMethodStatus