Integrity desktop · KPI overview

North process train

26 tracked components · 5 process areas · browser-local project

Low8
Medium9
High9
Critical0
Portfolio health65%Assets below high risk
Inspection coverage90%30 mapped points
Review queue9High / critical components
Risk distributionScreened component mix
LIVE
8Low
9Medium
9High
0Critical
Inspection workloadCurrent campaign readiness
30 PTS
Overdue3
On track27
AIMS overview
This PC / North process train / AIMS overview

AIMS

Integrity cockpit · 06 Sep 2026

Good morning, your risk picture is ready.

26 components across 5 process areas. Includes 24 illustrative demo components; example risk scores are not verified field assessments.

Live snapshot

26

Tracked components

Across 5 process systems

Live snapshot

9

High / critical risk

Requires engineering review

Live snapshot

3

Inspection points overdue

Prioritise the next campaign

Live snapshot

100%

Risk coverage

All seeded components screened

Live system view

North process train

Hydrocarbon separation · Area 04 · Separation

Inspection due
Parametric vessel
Drag to orbit · scroll to zoom · click a point to inspect
V-101High pressure separator

Risk distribution

Screening matrix

Low8 components
Medium9 components
High9 components
Critical0 components

Risk score is a screening aid based on probability × consequence. Review decisions through your approved integrity process.

Next actions

Inspection points needing attention

Inspection pointMethodStatus
11:17 PM